Incorporated on August 7, 2015, ABReL has 282.8 MWp of operational solar capacity across Karnataka (20 MWp), Gujarat (145.4 MWp), Odisha (105 MWp) and Andhra Pradesh (12.4 MWp). It has entered into a 22-year PPA with Grasim and 25-year PPAs with GUVNL and GRIDCO. Initially, Aditya Birla Nuvo Ltd (ABNL; part of the Aditya Birla group) held 51% stake in ABReL, while AEIF Mauritius SPV 2 Ltd (AEIF; an Abraaj group affiliate) held 49%. Following the merger of ABNL with Grasim (effective July 1, 2017) and purchase of stake from the Abraaj group (May 2018), Grasim holds the entire stake in ABReL. On June 27, 2018, ABReL acquired 49% stake in Waacox and on July 5, 2021, it acquired the remaining 51%, making Waacox a wholly owned subsidiary.
ABSL was incorporated in 2016 to participate in solar auctions in Karnataka. It has operational capacity of 100.18 MWp. Grasim held 100% stake in ABSL. ABSL was merged with ABReL in July 2023. It entered into a 25-year PPA with BESCOM for 22.3 MWp and HESCOM for 44.6 MWp.
Waacox was set up by Sangam Renewables Ltd (Sangam) in fiscal 2016 to bid for projects under the Solar Agriculture Feeder Scheme in Maharashtra. ABReL acquired 49% stake in the company in June 2018 and executed a shareholding agreement to acquire the remaining 51% from Sangam after one year from the date of commissioning of projects. In July 2021, it acquired the remaining 51% stake, making Waacox its 100% subsidiary. Waacox has 24.4 MWp of operational capacity in Maharashtra, with MAHAGENCO as the sole procurer for the entire capacity.
Incorporated on June 19, 2017, ABReL SPV1 has 77.8 MWp of operational solar capacity across Maharashtra (1.95 MWp), Rajasthan (6 MWp), Karnataka (25.5 MWp), Gujarat (5 MWp), Chhattisgarh (29.8 MWp) and Andhra Pradesh (9.6 MWp). ABReL holds 74% stake in ABReL SPV1, and UltraTech, which is also a captive power procurer for the entire capacity, holds 26%.
Incorporated on May 8, 2018, ABRSL has 34.2 MWp of solar capacity in Odisha and Chhattisgarh. ABReL holds 74% stake in ABRSL, while 26% is held by Hindalco, the captive power procurer for the entire capacity.
Incorporated on May 8, 2018, ABRUL has 7 MWp of solar capacity in Utkal, Odisha. ABReL holds 74% stake in ABRUL, while 26% is held by Utkal Alumina International Ltd, a subsidiary of Hindalco, the captive power procurer for the entire capacity.
Incorporated on April 10, 2020, ABReL Solar has operational solar capacity of 79.2 MWp in Madhya Pradesh, Maharashtra, Gujarat and Uttar Pradesh, and wind capacity of 21 MW. Further, setting up a 11.7 MW solar and 21 MW wind project in Karnataka. ABReL holds 74% stake in ABReL Solar, while Hindalco, the captive power procurer for the entire capacity, holds the remaining.
Incorporated on April 13, 2020, ABReL Energy has operational solar capacity of 27.1 MWp in Madhya Pradesh and Rajasthan. ABReL holds 74% stake in ABReL Energy, while 26% is held by UltraTech, which is also the captive power procurer for the entire capacity.
Incorporated on December 28, 2020, ABReL SPV2, a 100% subsidiary of ABReL, has constructed 122.37-MWp solar capacity in Gujarat. The remaining 33.63 MWp is expected to be commissioned by January 2024. The company has signed a 25-year PPA with GUVNL, which is also the sole offtaker for the entire capacity. Further, the company is developing 650 MWp with GUVNL as the counterparty.
Incorporated on August 31, 2021, ASPL has operational capacity of 46MWp of solar capacities in Odisha and Gujarat, and 14.3 MW wind in Gujarat. It also has 54 MWp of solar and 86 MW of wind project under construction in Madhya Pradesh. ABReL holds 74% stake in ASPL, while 26% is held by Grasim, the captive power procurer for the entire capacity.
Incorporated on March 10, 2022, ACEL has operational capacities of 13-MWp solar and 10.5-MW wind in Mahuva, Gujarat, commissioned in June 2023. ABReL holds 74% stake in ACEL, while 26% is held by CEL, the captive power procurer for the entire capacity.
Incorporated on June 15, 2022, AOSL has operational 14.20 MWp solar capacity in Hirmimunda, Odisha. Additional capacity 9.20 MWp expected to become operational by December 31, 2023. ABReL holds 74% stake in AOSL, while 26% is held by UltraTech, the captive power procurer for the entire capacity.
Incorporated on June 22, 2022, AGEL is setting up 93 MWp solar capacity in Kurma, Chhattisgarh. ABReL holds 74% stake in AGEL, while 26% is held by UltraTech, the captive power procurer for the entire capacity.
Incorporated on June 16, 2022, AMRL is constructing solar capacity of 44.4 MWp and wind capacity of 50.5 MW in Madhya Pradesh. ABReL holds 74% stake in AMRL, while 26% is held by UltraTech, the captive power procurer for the entire capacity.
All the solar assets of the ABR group are funded in a debt-to-equity ratio of 80:20 (except Waacox, at 70:30). ABReL will be the holding company for all assets of the ABR group, with the captive power procurer—mainly an Aditya Birla group entity—holding at least 26% share.